<h4><strong></strong></h4>
<table> <tbody> <tr> <th>Client</th> <td></td> </tr> <tr> <th>Year</th> <td></td> </tr> <tr> <th>Value</th> <td></td> </tr> <tr> <th>Position</th> <td></td> </tr> </tbody> </table>
Description:
- Breaking up and removal of reinforced concrete payment and kerb.
- Enlargement of bridge to provide planked walkways on steel structure on both sides including metal balustrading.
- The work to be carried out approximately 5M above water level.Resurfacing of existing roadworks
- Landscaping and Associated Works.